Centres of Excellence

Overview

  1. CoEs to incentivize and motivate technology development and bridge the technology gaps in Capital Goods sector.
  2. Approved CoEs: 08

Details

ProjectIndustry Partner/s

Total Project Cost

(Rs Crores)

Status
CoE at CMTI, Bangalore by TMMATextile Machinery Manufacturers Association 20.00450 RPM loom developed
CoE at IIT, Madras (Machine Tools & Production Technology)
  1. M/s. Jyoti CNC Automation Ltd
  2. M/s. Micromatic Grinding Technologies,
  3. M/s. Ace Designers Ltd,
  4. M/s. Machine Tools Aids Bureau
  5. M/s. Chennai Metco Pvt. Ltd.,
  6. M/s. Interface Design Associate pvtLtd.,
56.125Ongoing
CoE at PSG College of Technology (Welding Technologies)

Technology 1:

Effica Automation Limited

PSG Industrial Institute

Technology 2:

enArka Instruments & systems (P) Ltd

MAK Controls & systems (p) Ltd

Technology 3:

Omega Weld Rods Systems

THIRUMALA ELECTRODES CO

26.70Completed
COE at Coimbatore by Sitarc(Smart SubmersiblePumping Solutions)Si’Tarc8.41Completed
CoE at HEC, Ranchi (Cubic Meter Hydraulic Excavator - HEX 400)HEC6.60Completed
CoE at IIT Delhi (Robot)M/s Laxmi Machine Works Limited4.6433Ongoing
CoE at IIT Kharagpur for Advanced Manufacturing
  1. M/s. Heavy Engineering Corporation Limited, Ranchi,
  2. M/s. Tata Steel,
  3. M/s. Bharat Heavy Electricals Limited,
  4. M/s. Tata Sons, Mumbai and M/s. Tata Motors Limited,
  5. M/s Tata Consultancy Services Research and Innovation,
65.19Ongoing
COE at IISc Bangalore (Additive Manufacturing for High Performance Metallic Alloys)Wipro-3D, business unit of Wipro Infrastructure Engg10.40Ongoing

Common Engineering Facility Centres (CEFCs)

Overview

  • CEFCs provides capital intensive technical services to the entire supply chain of the Capital goods sector.
  • CEFCs approved: 10 Nos.

Details

ProjectIndustry Partner/s

Total Project Cost

(Rs Crores)

Status
CEFC at HMT MTL, (Skill Development)HMT0.97Completed
CEFC at IISc Bangalore (Industry 4.0 namely I4.0 India@IISc)TCS, Ashok Leyland, YASKAWA, Toyota Kirloskar Motors25.60Ongoing
CEFC at CMTI Bangalore (modernization of Precision Metrology Laboratory)Govt. of Karnataka9.18Ongoing
CEFC at HEC, RanchiHEC50.00Ongoing
CEFC at Bardoli, (SETU) FoundationSurat by Science Engineering & Technological Upliftment (SETU) Foundation50.27Ongoing
CEFC by M/s. SLK CSR foundation,Pune (Industry 4.0)Kirloskar Group19.35Ongoing

CEFC at IIT-Delhi

on Smart Technology Enabled Manufacturing

Parametric Technology Corporation, KUKA India PvtLTd, SingEx Exhibitions (India) PvtLtd., Pepperl Fuchs FAPL, Adroitec Information Systems PvtLTd, B&R Industrial Automation, Rockwell Automation India Pvt. Ltd, Quality Council of India, Mitsubishi Electric India Pvt. Ltd., Festo India Pvt. LTd30.85Ongoing
CEFC at Chakan, Pune (Tools & Dies Industry)TAGMA49.48Ongoing
CEFC at CMTI, Bangalore (Industry 4.0, & IoT Internet of Things)M/s Utthunga Technologies Pvt Ltd29.70Ongoing
CEFC (skill development)M/s Korus Engineering Solutions Pvt. Ltd.6.00Ongoing

Technology Acquisition Fund Programme (TAFP)

Overview

  • TAFP component support transfer of technologies.
  • Projects approved: 05Nos.

Details

Details

ProjectIndustry Partner/sTotal Project Cost (Rs Crores)Status
TAFP by HMT MTL (Guideway CNC Lathe)HMT4.40Completed
TAFP by HMT MTL (Develop Turn Mill Centre)HMT1.5280Completed
TAFP by Allied Engineering Pvt. Ltd (Heavy Duty Electrical Power Cables)Allied Engineering Pvt. Ltd14.33Ongoing
TAFP (Robotic Laser Cladding Technology)Industrial Processors &Metallizers Pvt. Ltd4.975Ongoing
TAFP (Titanium Casting with Ceramic Shelling Technology)PTC Industries Ltd51.02Ongoing

Integrated Industrial Infrastructure Facilities (IIFC)

Highlights

  • The first of such projects is approved under the scheme in Karntaka and established at Tumakuru, Banglore.
  • A Special Purpose Vehicle (SPV) called Tumakuru Industrial Township Limited has been established.
  • India’s first Machine Tool Park is being developed to international standards
  • In land area of 530 acres, about 158 plots of various dimensions ranging from 0.5 Acre to 5+ Acres of land are plotted.

Details

ProjectIndustry Partner/s

Total Project Cost

(Rs Crores)

Status
IIIF at Integrated Machine Tools Park near Tumkur, KarnatakaGovernment of Karnataka

508.00

(including land cost)

Ongoing

(90% works

Completed).

Other Projects

Details (All projects are ongoing)

Project

Total Project Cost

(Rs Crores)

Nano Manufacturing Technology Centre (NMTC) of CMTI25.04
Sensor Technology Development Facility (STDF) project of CMTI52.60

MHRD –Uchhtar Aavishkar Yojana (UAY)

Project 1: Sensors coal loading and flame stability

Project 2: Electric Pulse Aided Bending and Roll Forming Processes

Project 3: Hybrid Sand 3D Printers

9.1518

MHRD -IMPRINT

Project1: Incremental Forming Process for Dieless Manufacturing (5506)

Project2: Monitor and renew machine tool performance (IMPRINT5509)

Project 3: Land Based Turbine Components (5868)

Project4: Next Generation Heat Exchangers Design (6362)

Project5: Erosion Corrosion and Deposition Resistant Coating for Coal Fired Boilers

Project6: Online process monitoring process and studies on dynamic mechanical behaviour of manufactured parts